Practical Application of Earned Value Performance Measurement
by Paul E Harris
9781921059544
$23.95
Enter your e-mail address to be notified when product is in stock
Notify Me!
Seller Info
bookpod (3945)
Seller Accepts
Shipping Policy
Orders are generally dispatched the following business day. Standard shipping times are usually 1-3 business days for domestic and 5-10 days for international.
Return Policy
Money Back / Exchange within 14 days
Description
Practical Application of Earned Value Performance Measurement by Paul E Harris (Spiral Bound Student Handout)

(Please allow 5 extra working days for production of the manual)

Product details
Paperback: 148 pages
Publisher: Eastwood Harris
ISBN:978-1-921059-54-4
Trim size: 210 x 297 mm

 
Synopsis:   

This book is a student handout for the course detailed below. The instructor PowerPoint slide show and samples of the handout and PowerPoint slide show may be purchased through www.eh.com.au.
 
SHORT DESCRIPTION OF COURSE AVAILABLE FROM www.eh.com.au
COURSE AIM

The aim of this course is to demonstrate:
  • What EVPM is.
  • Why projects and organisations benefit from an EVPM system.
  • An overview of current standards including AS4817 on which the course is based.
  • Practical advice on how to set up, run and report an EVPM system.
  • It includes advices on how to collect EV data from existing corporate systems, a subject often omitted in other EV courses.
COURSE DELIVERY
 

The course is presented in one day using a PowerPoint presentation and includes workshops at the end of each module and a copy of AS4817.
 
Modules include:
  • Introduction and Overview of EVPM
  • Comparing committed cost management and EVPM systems
  • Standards and other supporting Literature
  • Setting up an EVPM system as outlined in AS4817
  • How EVPM is applied to projects
  • Creating and setting the Performance Measurement Baseline
  • Measuring progress and calculating the Earned Value
  • Recording Actuals
  • Calculating the Estimate to Complete and Earned Schedule
  • Reporting and software tools
  • Scope changes, resetting the baseline, hints and tips.
COURSE MATERIAL

The course material consists of :
  • A PowerPoint presentation of approximately 120 slides.
  • A course handout with the slides, workshops and explanatory notes.
  • A copy of AS4817.
Reviews (0)
Currently there are no reviews for this product.
Questions
Currently there are no questions for this product.
<-- Digital window verification 001 -->